4
Shared Docs
4
Same-Page
4 / 4
Mentions
5 106 90 91 Cabanas 1-4 Flagpole Pool Danny & Keshawn Danny & Keshawn Dimmers Dimmers Install Dimmers Dimmers not working properly 92 MC New Planter Danny & Keshawn MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23: scheduled to arrive at 93 Mid Waterf
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
04 Lighting & Electrical 105 90 Cabanas 1-4 Dimmers Install Dimmers 106 91 Flagpole Pool Dimmers Dimmers not working properly 107 92 MC New Planter MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at 108 93 TiId Waterfall Pond F
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
scription 84 New WIFI System 85 GSJ 86 LSJ Cistern 1 87 GSJ R/O 88 GSJ R/O parts 89 R/O Water 90 Cabanas 1-4 91 Flagpole Pool 92 MC New Planter 93 Tiki Waterfall 94 95 se Flagpole Pool GSJ Peters Point Cabana 1 97 Master Bedroom 98 99 100 GYM Chillax Sam's Place 101 GSJ Mast
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
cal 90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers C 91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly 92 MC New Planter Danny & Keshawn MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at 93 Tild Waterfa
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both New Planter and Tropical Shipping STT

Oliver Stone
PERSON
Jeffrey Epstein
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSONGSJ Terrace
ORGANIZATIONSolar Lights
ORGANIZATIONTiki Hut
ORGANIZATIONMain Compound
ORGANIZATIONJE Denali
ORGANIZATION
Cabana
LOCATIONWreckshop
ORGANIZATION
Marc Rich
PERSONDaphne Wallace
PERSON
Carlos
PERSONBill Terry
PERSONPaul Gandy
PERSONBarge
PERSONMB Bath
ORGANIZATIONLeon Black
PERSON
Palm Beach
LOCATION