5 106 90 91 Cabanas 1-4 Flagpole Pool Danny & Keshawn Danny & Keshawn Dimmers Dimmers Install Dimmers Dimmers not working properly 92 MC New Planter Danny & Keshawn MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23: scheduled to arrive at 93 Mid Waterf
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
04 Lighting & Electrical 105 90 Cabanas 1-4 Dimmers Install Dimmers 106 91 Flagpole Pool Dimmers Dimmers not working properly 107 92 MC New Planter MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at 108 93 TiId Waterfall Pond F
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
scription 84 New WIFI System 85 GSJ 86 LSJ Cistern 1 87 GSJ R/O 88 GSJ R/O parts 89 R/O Water 90 Cabanas 1-4 91 Flagpole Pool 92 MC New Planter 93 Tiki Waterfall 94 95 se Flagpole Pool GSJ Peters Point Cabana 1 97 Master Bedroom 98 99 100 GYM Chillax Sam's Place 101 GSJ Mast
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
cal 90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers C 91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly 92 MC New Planter Danny & Keshawn MC Planter & Palm Tree Lighting In progress Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at 93 Tild Waterfa
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both New Planter and Christmas Cove Service Dock

Oliver Stone
PERSON
Jeffrey Epstein
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSONGSJ Terrace
ORGANIZATIONSolar Lights
ORGANIZATIONTiki Hut
ORGANIZATIONMain Compound
ORGANIZATIONJE Denali
ORGANIZATION
Cabana
LOCATIONWreckshop
ORGANIZATION
Marc Rich
PERSONDaphne Wallace
PERSON
Carlos
PERSONBill Terry
PERSONPaul Gandy
PERSONBarge
PERSONMB Bath
ORGANIZATIONLeon Black
PERSON
Palm Beach
LOCATION