3
Shared Docs
3
Same-Page
5 / 3
Mentions
andle the distribution of existing phone services.] [5-29-19] GSJ Wifi is in progress this week] Camera setup at Christmas Cove"' Pending "To order Yeti Solar 96 Units and Panels as per email 5/24/19 [5/29/ J Deck Nest 85 GSJ Cameras Camera is active) 97 98 R/O & Englneedng 99 86 LSJ Cistern 1
io 95 Chlliax Phone Plug 96 GSJ Master BR Master Bath 97 Library Reefco Air Handler Camera setup at Christmas Cove*" Pending Mike to order Yeti Solar Units and Panels as per email 5/24/19 [5/29/19 GSJ Dock Nest Camera s active] RIO & Engineering Order Pump for Cistem 1 for LSJ to complete cyste
be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not draining properly in Cabana 1 Install Kic
ndle the distribution of existing phone services] 15-29-191 GSJ Will is In progress this week] Camera setup at Chnstmas Cove— Pending Mike to order Yeti Solar Jermaine & Liston Units and Panels as per email 5/24/19 (5r29/19 GSJ DOck Nest 86 GSJ Cameras Camera is active) Rio & su riesdne !aciaserelliM
96 GSJ Master BR Michael & Charlie Master Bath 97 Library Reefco Air Handler DescnMon Camera setup at Christmas Ceram Pending Mike to order Yeti Solar Units and Panels as per email 5/24/19 (5/29/19 GSJ Dock Nest Camera is active) WO&Enolneedni Order Pump for Cistern 1 for LSJ to complete system.
be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor is not draining properly in Cabana 1 In
ndle the distribution of existing phone services.] [5-29-19] GSJ Will is in progress this week] Camera setup at Christmas Cove*** Pending to order Yeti Solar Units and Panels as per email 5/24/19 [5/29/19 GSJ Deck Nest Camera is active] R/O &Engineering Order Pump for Cistern 1 for LSJ to complete syst
be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is not draining properly in Cabana 1 Install
Entities connected to both Yeti Solar and Repair Ceiling
New Planter
LOCATIONBarge
PERSONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATION
Samantha Power
PERSONMuffler Rubber mount
LOCATIONIsland Wide
LOCATIONJohn Deere
PERSONColums
PERSONNC Unit
ORGANIZATIONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Robert Gates
PERSONPanels
ORGANIZATIONLeon Black
PERSON
Julie K. Brown
PERSONInsurance Coverage & Repairs
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONTrenching Area & Description
ORGANIZATION