4
Shared Docs
4
Same-Page
6 / 4
Mentions
andle the distribution of existing phone services.] [5-29-19] GSJ Wifi is in progress this week] Camera setup at Christmas Cove"' Pending "To order Yeti Solar 96 Units and Panels as per email 5/24/19 [5/29/ J Deck Nest 85 GSJ Cameras Camera is active) 97 98 R/O & Englneedng 99 86 LSJ Cistern 1
io 95 Chlliax Phone Plug 96 GSJ Master BR Master Bath 97 Library Reefco Air Handler Camera setup at Christmas Cove*" Pending Mike to order Yeti Solar Units and Panels as per email 5/24/19 [5/29/19 GSJ Dock Nest Camera s active] RIO & Engineering Order Pump for Cistem 1 for LSJ to complete cyste
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
ndle the distribution of existing phone services] 15-29-191 GSJ Will is In progress this week] Camera setup at Chnstmas Cove— Pending Mike to order Yeti Solar Jermaine & Liston Units and Panels as per email 5/24/19 (5r29/19 GSJ DOck Nest 86 GSJ Cameras Camera is active) Rio & su riesdne !aciaserelliM
96 GSJ Master BR Michael & Charlie Master Bath 97 Library Reefco Air Handler DescnMon Camera setup at Christmas Ceram Pending Mike to order Yeti Solar Units and Panels as per email 5/24/19 (5/29/19 GSJ Dock Nest Camera is active) WO&Enolneedni Order Pump for Cistern 1 for LSJ to complete system.
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
e the distribution of existing phone services.] [5-29-19] GSJ Will Is In progress this week] Camera setup at Christmas Cove"' Pending Mike to order Yeti Solar 96 Jermaine & Liston Units and Panels as per email 5124119 [5/29/19 GSJ Dock Nest 85 GSJ Cameras Camera is active] 97 98 RIO & Engineering
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
ndle the distribution of existing phone services.] [5-29-19] GSJ Will is in progress this week] Camera setup at Christmas Cove*** Pending to order Yeti Solar Units and Panels as per email 5/24/19 [5/29/19 GSJ Deck Nest Camera is active] R/O &Engineering Order Pump for Cistern 1 for LSJ to complete syst
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
Entities connected to both Yeti Solar and Tropical Shipping STT
Yacht
ORGANIZATIONBanquette
ORGANIZATIONChristmas Cove
LOCATIONAllied
ORGANIZATION
Jeffrey Epstein
PERSONBench
ORGANIZATION
Palm Beach
LOCATION
Oliver Stone
PERSON
Samantha Power
PERSONClutch
ORGANIZATION
Robert Gates
PERSONInsurance Coverage & Repairs
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONLighting & Electrical
ORGANIZATIONLeon Black
PERSONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATIONMB Bath
ORGANIZATIONHelipad Office
ORGANIZATION