3
Shared Docs
3
Same-Page
3 / 3
Mentions
,920 Option 5 — Fwd R/H Bulkhead HD Monitor $ 35,930 Option 6 — Cabin Inner Window Shade Assemblies $ 34,680 Option 7 — New Berthing Divan and Arm Rest Cabinets $ 8,670 Option 8 - Seat Hydrolocks $ 8,960 Option 9 — Conference Table Fixed Single Pedestal Base $ 7,550 Option10 — Fwd Cabin Bulkheads $
tion10 — Fwd Cabin Bulkheads $ 2,800 Option15 — Cabin Area 110 Vac Outlets $ 11,670 Option16 — Cabin Management Switches $ 49.940 Option17 — Entertainment System $ 649,927 Total of contract ($19,927) Less discount $ 630,000 Final Contract Amount ($ 250,000) Less initial deposit paid 6/21/13 ($ 65,000
,920 Option 5 — Fwd R/H Bulkhead HD Monitor $ 35,930 Option 6 — Cabin Inner Window Shade Assemblies $ 34,680 Option 7 — New Berthing Divan and Arm Rest Cabinets $ 8,670 Option 8 - Seat Hydrolocks $ 8,960 Option 9 — Conference Table Fixed Single Pedestal Base $ 7,550 Option10 — Fwd Cabin Bulkheads $
tion10 — Fwd Cabin Bulkheads $ 2,800 Option15 — Cabin Area 110 Vac Outlets $ 11,670 Option16 — Cabin Management Switches $ 49.940 Optionl7 — Entertainment System $ 649,927 Total of contract ($19,9272 Less discount $ 630,000 Final Contract Amount ($ 250.000) Less initial deposit paid 6/21/13 ($ 65,000
20 Option 5 — Fwd R/FI Bulkhead HD Monitor $ 35.930 Option 6 — Cabin Inner Window Shade Assemblies $ 3.4,680 Option 7 — New Berthing Divan and Arm Rest Cabinets $ 8,670 Option 8 — Seat Hydrolocks $ 8,960 Option 9 — Conference Table Fixed Single Pedestal Base $ 7,550 Option10 — Fwd Cabin Bulkheads $
tion10 — Fwd Cabin Bulkheads $ 2,800 Option15 — Cabin Area 110 Vac Outlets $ 11,670 Option16 — Cabin Management Switches $ 49,940 Option17 — Entertainment System $ 649,927 Total of contract ($19.927) Less discount $ 630,000 Final Contract Amount (S 250.000) Less initial deposit paid 6/21/13 (S 65,000
Entities connected to both Arm Rest Cabinets and Entertainment System