4
Shared Docs
4
Same-Page
4 / 4
Mentions
$ 3,470 Two (2) cabin power supplies and six (6) ALC light bulbs $ 820 Procure 9 Parasol (Tables) and 6 Standard (cabinetry) hinges $ 3,180 Procure one high resolution cockpit camera ($ 250,000) Less initial deposit paid 6/21/13 ($ 157.500) Less payment made 10/17/13 $ 20,340 Balance Due
ocks $ 8,960 Option 9 — Conference Table Fixed Single Pedestal Base $ 7,550 Option10 — Fwd Cabin Bulkheads $ 2,800 Option15 — Cabin Area 110 Vac Outlets $ 11,670 Option16 — Cabin Management Switches $ 49.940 Option17 — Entertainment System $ 649,927 Total of contract ($19,927) Less discount
ng-pects4o-aiFscaft-pewer, Additional cost-for-this-Option....$44,470 Authorized-Acceptance; for— —JEGE-,LLC Date OPTION 15 811 110 outlets Procure and install eight (8) 110VAC outlets for the main cabin area to compliment the USB charging ports. Metal plate bezels. Additional cost for this Opt
530 Option 12 Air Gazporn $ 12,680 Option 13 — LED Reading & Table Lights $ 14,170 Option 14 — USB Ports $ 2,800 Option 15 — Cabin Area 110 Vac Outlets $ 11,670 Option 16 — Cabin Management Switches $ 91,570 Option 17 — Entertainment System $ 18,460 Option 18 — Frequency Converter (outlets a
ng-pefts-te-airsraft-pewer, Additional cost-for-this Option....$44,470 Authorized-Acceptance; for JEGE-,LLO Date OPTION 15 811 110 outlets Procure and install eight (8) 110VAC outlets for the main cabin area to compliment the USB charging ports. Metal plate bezels. Additional cost for this Opt
530 Option 12 Air Gasper& $ 12,680 Option 13 — LED Reading & Table Lights $ 14,170 Option 14 — USB Ports $ 2,800 Option 15 — Cabin Area 110 Vac Outlets $ 11,670 Option 16 - Cabin Management Switches $ 49,940 Option 17 — Entertainment System a—Option-1.8—Frequenoy-Converter-coutlets-W14-misrowa
$ 3,470 Two (2) cabin power supplies and six (6) ALC light bulbs $ 820 Procure 9 Parasol (Tables) and 6 Standard (cabinetry) hinges $ 3,180 Procure one high resolution cockpit camera $ 177,840 Total Final Payment Due EFTA00582640
ocks $ 8,960 Option 9 — Conference Table Fixed Single Pedestal Base $ 7,550 Option10 — Fwd Cabin Bulkheads $ 2,800 Option15 — Cabin Area 110 Vac Outlets $ 11,670 Option16 — Cabin Management Switches $ 49.940 Optionl7 — Entertainment System $ 649,927 Total of contract ($19,9272 Less discount
Entities connected to both Procure and Vac Outlets

Ronkonkoma
LOCATIONLarry Visoski
PERSONNew Berthing Divan
ORGANIZATIONArm Rest Cabinets
ORGANIZATION
Jeffrey Epstein
PERSONEntertainment System
ORGANIZATIONSeat Hydrolocks
PERSONDivan
ORGANIZATIONF.A.A.
ORGANIZATIONInternational Jet Interiors, Inc.
ORGANIZATIONI.J.I.
ORGANIZATIONCohan
PERSONa Designated Engineering
ORGANIZATIONPotty Seat & Shroud
ORGANIZATIONR/H & IJH PSU /
ORGANIZATIONRill & LJH PSU /
ORGANIZATIONAft Bulkhead & Door
ORGANIZATIONAtklitional
ORGANIZATIONOption1 - Metal Plating
ORGANIZATIONCountertops & Doors
ORGANIZATION