4
Shared Docs
4
Same-Page
4 / 4
Mentions
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5131. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, of-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dire
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
m Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. =will schedule barge to pick up direc
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
urn Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both John Deere and Christmas Cove Service Dock

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONLeon Black
PERSONDarren Indyke
PERSON
Samantha Power
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSONDaphne Wallace
PERSON
Carlos
PERSONKaren
PERSONLighting & Electrical
ORGANIZATIONTropical Shipping STT
ORGANIZATIONFranks Electric
ORGANIZATIONMB Bath
ORGANIZATIONFlanders
LOCATIONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATION
Julie K. Brown
PERSONNautica
ORGANIZATION