4
Shared Docs
4
Same-Page
4 / 4
Mentions
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
ibrary 52 LSJ Tlkl Hut Old Generators Flagpole Pool Five Palms Five Palms GSJ R/O GSJ New Dock GSJ New Dock LSJ/GSJ Cables Permit 53 LSJ MB Bath 54 55 56 57 LSJ Main Compound Tunnel Entrance LSJ Helipad LSJ Dock Exported an June 9.2019 933.34 PM BOT Michael & Contractors Amy Dempsey
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5131. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, of-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dire
Flagpole Pool Five Palms Five Palms GSJ R/O GSJ New Dock GSJ New Dock LSJ/GSJ Cables Permit 51 52 53 54 55 56 LSJ FaclIty Entrance LSJ MB Bath LSJ Main Compound Tunnel Entrance LSJ Helipad LSJ Dock Contraotcrs .Freezer Franks Electric Contractors Global Tech 11. Permits Permits
m Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. =will schedule barge to pick up direc
ipment and an operator. 51 LSJ Library Roofing & Trim 52 LSJ Tikl Hut Kitchen Order Conan countertop for Tiki Hut Kitchen Carpentry 53 LSJ MB Bath I Shower Tiles Awaiting quote from . this project involves new shower hardware, plumbing, an i e wo 54 LSJ Main Compound Gazebo Build 2 Gaze
urn Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
ms GSJ R/O GSJ New Dock GSJ New Dock LSJ/GSJ Cables 48 Permit 49 Heavy Machinery Trencher 50 LSJ Library 51 LSJ Fadlty Entrance 52 LSJ MB Bath 53 LSJ Main Compound 54 Tunnel Entrance 55 LSJ Helipad 56 LSJ Dock Exporters on Juno 6. 2019 6 07 52 ALl BOT Michael & Contractors Amy Dem
Entities connected to both John Deere and MB Bath

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONLeon Black
PERSONDarren Indyke
PERSON
Samantha Power
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSONDaphne Wallace
PERSON
Carlos
PERSONKaren
PERSONLighting & Electrical
ORGANIZATIONTropical Shipping STT
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATIONFlanders
LOCATIONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATION
Julie K. Brown
PERSONNautica
ORGANIZATION