4
Shared Docs
4
Same-Page
4 / 4
Mentions
Wing Trailing Edge Detailed Inspection GV AMM Special Inspection (R) 24 MOS 6385.9 1575 11 Sep 2013 24 Sep 2015' 7 Mos 2.0 271110 Airframe Aileron Inter-column Linkage Disconnect Assemblies - Operational Test GV AMM Functional/Ops Test (0) 1000 Hrs 48 MOS 6385.9 7385.9Hrs 1575 11 Sep 2013 11 Sep 2017
Inspection GV AMM Special Inspection (M) 24 MOS 6647.1 1657 02 Mar 2014 12 Feb 2016' 12 Mos 3.0 531085 Airframe External Aft Fuselage and Empennage FS 758 - FS 1123 Viewed From Ground GV AMM Special Inspection (R) Zonal Inspection 24 MOS 6385.9 1575 11 Sep 2013 11 Sep 2015 7 Mos 2.0 531090
on Communication 0.0 Airframe MAN & Surveillance Systems. LLC 0 Notes: [36 MOS Initial Req.] 13 Mar 2012 36MOS" 13 Mar 2015 52 Days 271110 Aileron Inter-column Linkage Disconnect G550 AMM 1000 Hrs 2849.4 3849.4Hrs 382.9 Hrs * Airframe MAN Assemblies Operational Test 05.2000 833 Mfga: 27.11-01 Not
#: 53.26-00 Notes: [End of Month Item] [1 MOS Window) 10 15 Oct 2007 24 MOS 19 Mar 2014 31 Mar 2016' 14 Mos 531085 External Aft Fuselage and Empennage FS G550 AMM 3307.8 * Airframe MAN 758 FS 1123 Viewed From Ground - 05-2000 927 Zonal Inspection Mfg#: 53.00-00 Notes: [End of Month Item] (1 MO
s Airframe MAN Front Frame (Right) - Detailed Inspection 05-20-00 741 Mfg#: 78-30-30 Notes: (50 Hour Window] 31 Aug 2003 18 Sep 2014 271110 Aileron Inter-column Linkage Disconnect G550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs * Airframe MAN Assemblies • Operational Test 05-20-00 741 Mfg#: 27.11.01
g#: 53-26-00 Notes: [End of Month Item] [1 MOS Window) 10 15 Oct 2007 24 MOS 16 Sep 2014 30 Sep 2016' 7 Mos 531085 External Aft Fuselage and Empennage FS 6550 AMM 1903.5 * Airframe MAN 758 - FS 1123 Viewed From Ground - 05-20-00 741 Zonal Inspection Mfg#: 53-00-00 Notes: [End of Month Item] (
s Airframe MAN Front Frame (Right) - Detailed Inspection 05-20-00 741 Mfg#: 78-30-30 Notes: (50 Hour Window] 31 Aug 2003 18 Sep 2014 271110 Aileron Inter-column Linkage Disconnect G550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs * Airframe MAN Assemblies • Operational Test 05-20-00 741 Mfg#: 27.11.01
g#: 53-26-00 Notes: [End of Month Item] [1 MOS Window) 10 15 Oct 2007 24 MOS 16 Sep 2014 30 Sep 2016' 7 Mos 531085 External Aft Fuselage and Empennage FS 6550 AMM 1903.5 * Airframe MAN 758 - FS 1123 Viewed From Ground - 05-20-00 741 Zonal Inspection Mfg#: 53-00-00 Notes: [End of Month Item] (
Entities connected to both Aileron Inter-column and Empennage FS

Samantha Power
PERSONAileron Control
ORGANIZATIONTrim Cables
ORGANIZATIONRudder Control
ORGANIZATIONWing Rear Beam
ORGANIZATIONUpper Surface of Center Wing
ORGANIZATIONFirst Aid Kit
ORGANIZATIONElevator Control
ORGANIZATIONTrash Receptacle Enclosure
ORGANIZATIONMain Fuel Boost Pump
ORGANIZATIONCowl Doors
ORGANIZATIONMain Landing Gear Corrosion
ORGANIZATIONFuel Shut
PERSONAir Data Module
ORGANIZATIONPower Transfer Unit
ORGANIZATIONOxygen Mask / Regulator (Copilot
ORGANIZATIONWheel Steering Unit - Lubrication
ORGANIZATIONCockpit Voice Recorder Operational Test
ORGANIZATIONRudder Skins
ORGANIZATIONLeft Electronic Equipment Rack
ORGANIZATION