4
Shared Docs
4
Same-Page
4 / 4
Mentions
Airframe MAN 05.20.00 949 Mfg#: 2561-03 Notes: [End of Month Item) [1 MOS Window) 31 Aug 2003 12 MOS 20 Oct 2014 31 Oct 2015 9 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) G550 AMM 3444.5 * Airframe MAN Detailed Inspection 05.20.00 949 Mfga: 2625-01 Notes: [End of Month Item) (1 MOS Window) 31
833 Mfga: 27.11-01 Notes: [End of Month Item] [50 Hour Window] [I MOS Window] 23 20 Jun 2013 48 MOS 10 Apr 2013 30 Apr 2017 27 Mos 271303 Aileron Hardover Prevention System (Left) G550 AMM 1000 Hrs 2849.4 3849.4Hrs 382.9 Hrs Airframe MAN Operational Check 05.2000 833 M10:27-11-17 Notes: [50 Hour Window] 31 A
egrity Test 05.20.00 741 Mfg#: 26.21.00 Notes: [End of Month Item] (1 MOS Window] 31 Aug 2003 24 MOS 26 Aug 2014 30 Sep 2016' 7 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) 6550 AMM 2403.2 * Airframe MAN • Detailed Inspection 05.20-00 970 Mfg#: 26.25.01 Notes: [End of Month Item] (1 MOS Window] 3
741 Mfg#: 27.11.01 Notes: (End of Month Item] (50 Hour Window] [1 MOS Window] 23 20 Jun 2013 48 MOS 26 Aug 2014 30 Sep 2018' 31 Mos 271303 Aileron Hardover Prevention System (Left) 6550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs Airframe MAN • Operational Check 05-10-10 741 Mfg#: 27-11-17 Notes: [50 Hour Window]
egrity Test 05.20.00 741 Mfg#: 26.21.00 Notes: [End of Month Item] (1 MOS Window] 31 Aug 2003 24 MOS 26 Aug 2014 30 Sep 2016' 7 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) 6550 AMM 2403.2 * Airframe MAN • Detailed Inspection 05.20-00 970 Mfg#: 26.25.01 Notes: [End of Month Item] (1 MOS Window] 3
741 Mfg#: 27.11.01 Notes: (End of Month Item] (50 Hour Window] [1 MOS Window] 23 20 Jun 2013 48 MOS 26 Aug 2014 30 Sep 2018' 31 Mos 271303 Aileron Hardover Prevention System (Left) 6550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs Airframe MAN • Operational Check 05-10-10 741 Mfg#: 27-11-17 Notes: [50 Hour Window]
orward Galley Annex) 0.0 474276 NSN 0 No 0 26.24.03 work pack FLO14715 2849.4 Hrs 833 CA_ 04 Apr 2013 1.00 899.966400 262560 Airframe Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection 26.25.01 (End of Month Item) (1 MOS Window) 12 MOS 3444.5 Hrs 949 CI_ 21 Oct 2014 31 Oct 2015 1.00 262
302 Force Link Assembly (Right) - Removal / Installation 0.0 0.0 Hrs 2.00 1159C50258-2 0 0 OL No 0 26 Nov 2007 Airframe 27.11.17 271303 Aileron Hardover Prevention System (Left) - Operational Check 1000 Hrs 2849.4 Hrs 3849.4Hrs 1.50 833 OL 10 Apr 2013 Airframe 27.11.17 [50 Hour Window] 271304 Aileron Hardov
Entities connected to both Trash Receptacle Enclosure and Aileron Hardover Prevention System

Samantha Power
PERSONMain Fuel Boost Pump
ORGANIZATIONTrim Cables
ORGANIZATIONRudder Control
ORGANIZATIONWing Rear Beam
ORGANIZATIONAileron Control
ORGANIZATIONFirst Aid Kit
ORGANIZATIONAileron Inter-column
ORGANIZATIONCowl Doors
ORGANIZATIONLongitudinal Control System Friction
ORGANIZATIONPower Transfer Unit
ORGANIZATIONElevator Control
ORGANIZATIONService Life
ORGANIZATIONCockpit Voice Recorder Operational Test
ORGANIZATIONEmpennage FS
ORGANIZATIONFuel Shut
PERSONAlternate Fuel Boost Pump
ORGANIZATIONUpper Surface of Center Wing
ORGANIZATIONWheel Steering Unit - Lubrication
ORGANIZATIONOxygen Mask / Regulator (Copilot
ORGANIZATION