7
Shared Docs
7
Same-Page
7 / 7
Mentions
y) Visual Inspection 1184 Utilization Mfg#: 26.24.00FP Notes: (End of Month Item) MOS 04 Nov 2016 31 Dec 25 Days 31 Dec 2016 2016' 282651 Main Fuel Boost Pump (Left) - Fuel Leak G550 AMM 500 Hrs 4971.3 5471.3Hrs 156.4 Hrs Based on Airframe MAN Check 05-10-10 1111 Utilization Mfg#: 28.26-01 Nnto
130 Utilization Mfgit: 25-63-03-AT Notes: [End of Month Item) 12 30 May 2008 12 MOS 04 Mar 2016 31 Mar 115 Days 31 Mar 2017 2017' 262560 Trash Receptacle Enclosure (Aft Lavatory) G550 AMM 5070.3 Based on * Airframe MAN Detailed Inspection 05-20-00 1130 Utilization Mfg#: 26-25-01 Notes: [End of Month
off Valve (Right) - Operational Check 7012.3 282630 1737 1.0 Airframe 24 MOS 05 Sep 2014 10 Sep 2016' 19 Mos GVAMM FunctionatiOps Test (O) Main Fuel Boost Pump (Lett) Fuel Leak Check 500 Hrs 7028.6 7528.6Hrs 276.0 Hrs 282651 1159SCP500.7 1741 Airframe 22 Sep 2014 GVAMM Special Inspection (R) Main
Bottle Pressure Switch Operational Test GV AMM Functionat(Ops Test (O) 24 MOS 6460.9 1611 10 Nov 2013 10 Nov 2015 9Mos 1.0 262560 Airframe Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection A800100.2 NSN GV AMM Special Inspection (R) 12 MOS 7012.3 1737 05 Sep 2014 10 Sep 2015' 7Mos 1.0 2625
ction 05.20.00 711 Mfg#: 32-14-03 Notes: [End of Month Item] (1 MOS Window] 15 15 Jan 2010 36 MOS 19 Apr 2012 28 Feb 2015' 39 Days 282651 Main Fuel Boost Pump (Left) - Fuel Leak G550 AMM 500 Hrs 3307.8 3807.8Hrs 341.3 Hrs Airframe MAN Check 05-2000 927 Mfg#: 28-26-01 Notes: 19 30 Jun 2011 17 M
Airframe MAN 05.20.00 949 Mfg#: 2561-03 Notes: [End of Month Item) [1 MOS Window) 31 Aug 2003 12 MOS 20 Oct 2014 31 Oct 2015 9 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) G550 AMM 3444.5 * Airframe MAN Detailed Inspection 05.20.00 949 Mfga: 2625-01 Notes: [End of Month Item) (1 MOS Window) 31
rillator Electrode Pads - Discard (Set DP2/DP6 1974.7 Airframe MAN No. 2) LOT-41014-0954 781 Notes: 30 Nov 2014 30 Apr 2017 14 Mos 282651 Main Fuel Boost Pump (Loft) - Fuel Leak 1159SCP500-7 6550 AMM 500 Hrs 2551.2 3051.2Hrs 461.2 Hrs Airframe MAN Check 1714 05-10-10 1039 Mfg#: 28.26-01 Notes:
egrity Test 05.20.00 741 Mfg#: 26.21.00 Notes: [End of Month Item] (1 MOS Window] 31 Aug 2003 24 MOS 26 Aug 2014 30 Sep 2016' 7 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) 6550 AMM 2403.2 * Airframe MAN • Detailed Inspection 05.20-00 970 Mfg#: 26.25.01 Notes: [End of Month Item] (1 MOS Window] 3
rillator Electrode Pads - Discard (Set DP2/DP6 1974.7 Airframe MAN No. 2) LOT-41014-0954 781 Notes: 30 Nov 2014 30 Apr 2017 14 Mos 282651 Main Fuel Boost Pump (Loft) - Fuel Leak 1159SCP500-7 6550 AMM 500 Hrs 2551.2 3051.2Hrs 461.2 Hrs Airframe MAN Check 1714 05-10-10 1039 Mfg#: 28.26-01 Notes:
egrity Test 05.20.00 741 Mfg#: 26.21.00 Notes: [End of Month Item] (1 MOS Window] 31 Aug 2003 24 MOS 26 Aug 2014 30 Sep 2016' 7 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) 6550 AMM 2403.2 * Airframe MAN • Detailed Inspection 05.20-00 970 Mfg#: 26.25.01 Notes: [End of Month Item] (1 MOS Window] 3
lve (Right) - Operational Test 500 Ms 4339.4 4839.4Hrs 260.2 Its 281408 1460 0-5 Airframe 03 Jan 2014 4550 AMM Special inspection (R) 01 Main Fuel Boost Pump (Len) . Fuel Leak Check 500 His 4339.4 4839.4Hrs 2502 Hrs 282651 1460 Airframe 03 Jan 2014 0550 AMM Special Inspection (R) Main Fuel Boost
Operational Test (FAR 91.207) 4550.4 256306 1644 1.0 Airframe 12 MOS 20 Jun 2014 30 Jun 2015 54 Days 6550 AMM Functional/Ops Test (0) 01 Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection 4560.4 262560 1544 1.0 Airframe 12 MOS 20 Jun 2014 30 Jun 2015' 54 Days 6550 AMM Special InsporAlon (R
lter (Right) Removal r Installation 1159SCP500-15 No Airframe 28.26.03 0846 0.0 0 0 0.0 Hrs 0 CtL 26 Nov 2007 1.50 7532.842800 282007 Main Fuel Boost Pump (Left) - Inspection Airframe 28.26.01 0.0 Hrs 0 OL 26 Nov 2007 1.00 282008 Main Fuel Boost Pump (Right) Inspection Airframe 28.26.01 0.0 H
orward Galley Annex) 0.0 474276 NSN 0 No 0 26.24.03 work pack FLO14715 2849.4 Hrs 833 CA_ 04 Apr 2013 1.00 899.966400 262560 Airframe Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection 26.25.01 (End of Month Item) (1 MOS Window) 12 MOS 3444.5 Hrs 949 CI_ 21 Oct 2014 31 Oct 2015 1.00 262
Entities connected to both Main Fuel Boost Pump and Trash Receptacle Enclosure

Samantha Power
PERSONWing Rear Beam
ORGANIZATIONFirst Aid Kit
ORGANIZATIONRudder Control
ORGANIZATIONTrim Cables
ORGANIZATIONAileron Control
ORGANIZATIONService Life
ORGANIZATIONFuel Shut
PERSONPower Transfer Unit
ORGANIZATIONElevator Control
ORGANIZATIONCowl Doors
ORGANIZATIONAileron Inter-column
ORGANIZATIONCockpit Voice Recorder Operational Test
ORGANIZATIONEmpennage FS
ORGANIZATIONGeneral Dynamics Company
ORGANIZATIONSpare Squib
PERSONMain Landing Gear Corrosion
ORGANIZATIONAir Data Module
ORGANIZATIONLongitudinal Control System Friction
ORGANIZATIONUpper Surface of Center Wing
ORGANIZATION