From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 19:40:49 +0000 on builiding b can we have a flat roof? On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace <1 Greet
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: I. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:21:02 +0000 ok but what about a flat roof On Wed, Apr 22, 2015 at 4:19 PM, Daphne Wallace < > wrote: Greeti
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:40:48 +0000 i suggest that as we are taking down the current shed can we flip the structure and move the buili
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
From: jeffrey E. <[email protected]> Sent: Wednesday, April 22, 2015 7:39 PM To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions page 9 elevaion is wrong shoudl extend past te= wall O= Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Gree=ings Sir, Revision
ents from Mr. Epstein at a recent site visit on Friday, April 17, =015. In summary, the changes requested are as follows: 1. * The longer building (R.O. Bldg.) will be expand=d to a width of 60 feet. There will be roll up doors on both of the short =nds. The two long sides will have no openings. The exter