3
Shared Docs
3
Same-Page
3 / 3
Mentions
completed most of the preliminary siting survey for the new cable landing. We are going to look at one more potential site and will be meeting with Clinton Hedrington of VIWAPA this week to work out their requirements and will be working with Mr. Epstein to select the preferred route. Once we have determined loca
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
re length. Once permitted and installed we will be required to monitor the cable for the first several years to look at impact. I know you spoke to Clinton Hedrington and he spoke to me about the cable. I told him it was imperative that VIWAPA immediately get in compliance with their cable monitoring so it does no
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
the entire length. Once permitted and installed we will be required to monitor the cable for the first several years to look at impact. I spoke to Clinton Hedrington and told him it was imperative that VIWAPA immediately get in compliance with their cable monitoring so it does not impact us on this permitting. W
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both Clinton Hedrington and Construction Activities & Implementation of Sediment Control

Bill Clinton
PERSON
Jeffrey Epstein
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONInteragency Meeting
ORGANIZATION
Sarah Ferguson
PERSONUtilities
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONUSACOE
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATION