3
Shared Docs
3
Same-Page
3 / 3
Mentions
completed most of the preliminary siting survey for the new cable landing. We are going to look at one more potential site and will be meeting with Clinton Hedrington of VIWAPA this week to work out their requirements and will be working with Mr. Epstein to select the preferred route. Once we have determined loca
th Mr. Epstein to select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
re length. Once permitted and installed we will be required to monitor the cable for the first several years to look at impact. I know you spoke to Clinton Hedrington and he spoke to me about the cable. I told him it was imperative that VIWAPA immediately get in compliance with their cable monitoring so it does no
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
the entire length. Once permitted and installed we will be required to monitor the cable for the first several years to look at impact. I spoke to Clinton Hedrington and told him it was imperative that VIWAPA immediately get in compliance with their cable monitoring so it does not impact us on this permitting. W
ether there is any merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
Entities connected to both Clinton Hedrington and the U.S. COE

Bill Clinton
PERSON
Jeffrey Epstein
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONInteragency Meeting
ORGANIZATION
Sarah Ferguson
PERSONUtilities
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATION