profile drawing as well as site plan drawings. These drawings will need to be provided by a designing engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to have VIWAPA to provide the engineering portions we need. 5.03 Project Workplan: A detailed discussion of th
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
works so this is something you should consider. Dock Maintenance I'll need an as-built of the dock which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide the details of the intake. We will file for a minor modification and maintenance for the dock with both CZM an
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
pplication and follow it through with Verni11 Roberts at DEP $3500.00 Preliminary Site Assessment Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish the new dock location, cable route and the landing site. Based on the size of the project foot print, we esti
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011 Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both Ryan Wisehart and Construction Activities & Implementation of Sediment Control

Paul Ryan
PERSON
Jeffrey Epstein
PERSONBioimpact, Inc.
ORGANIZATIONAmy Claire Dempsey
PERSONErika Kellerhals
PERSONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONFerguson Kroblin
PERSONInteragency Meeting
ORGANIZATIONUtilities
ORGANIZATION
San Juan
LOCATIONthe Coastal Zone
LOCATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONUSACOE
ORGANIZATION