ections of Dock Scope of work for Refurbishment of the Dock Bumpers, Removal of all Existing Bumpers Straightening or Replacing of New Fasteners, Grey Epoxy coating on Concrete Siding, Attaching New Bumpers and or undamaged Bumpers Staff Cottage Bathroom Dura Rock Staff Cottage Bathroom Estimated Dura
a Rock Staff Cottage Bathroom Estimated Duration: 25 days Brian: $300.00 per day @ 25 days = $7500.00 Buck: $120.00 per day @ $25 days = $3000.00 Verbal bids from others: 2 pers @ $50.00 per hour, with no indication of duration Can they continue? regards Brice Brice Cordon The Saint James Group U
the Dock Bumpers, =div class="gmail_default" style="font•size:small">Removal of all Exist=ng Bumpers Str=ightening or Replacing of New Fasteners, Grey Epoxy coating on Concrete Siding, Attaching New Bump=rs and or undamaged Bumpers Staff Cottage Bathroom Dura Rock Staff Cottage Bathroom Estimated Dura
a Rock Staff Cottage Bathroom Estimated Duration: 25 days Brian: $300.00 per day @ 25 days = $7=00.00 Buck: $120.00 pe= day @ $25 days = $3000.00 Verbal bits from others: 2 pers @ $50.00 per hour, with no indication of duration Can they continue? EFTA_R1_01553271 EFTA02452702 regards Brice=/span>
ections of Dock Scope of work for Refurbishment of the Dock Bumpers, Removal of all Existing Bumpe=s Straightenin= or Replacing of New Fasteners, Grey Epoxy coating on Concrete Siding, Attaching New Bumpers and or undamaged Bumpers Staff Cottage Bathroom Dura Rock Staff Cottage Bathroom Estimated Dur
oom Estimated Duration: 25 days : $300.00 per day @ 25 days = $7500.00 EFTA_R1_01553958 EFTA02453231 M: $120.00 per day @ $=5 days = $3000.00 Verbal bids from o=hers: 2 pers @ 550.00 per hour, with no indication of duration Can they continue? regards Mci=ont> • The Saint James Group USVI=/div