4
Shared Docs
4
Same-Page
4 / 4
Mentions
6 2016' N401HB Maintenance Next Due Report (GN-7003) Page 1 of 17 06 Dec 2016 ei 2016 Gulf stream Aerospace Corporation. All Rights Reserved. A General Dynamics Company EFTA00604371 ATA Description Part Number Source Document Frequency ("-Initial) CM Hrs/CyclDt Next Due ('=Ad)) Remaining lIrs/CyciCal '
130 Utilization Mfgit: 25-63-03-AT Notes: [End of Month Item) 12 30 May 2008 12 MOS 04 Mar 2016 31 Mar 115 Days 31 Mar 2017 2017' 262560 Trash Receptacle Enclosure (Aft Lavatory) G550 AMM 5070.3 Based on * Airframe MAN Detailed Inspection 05-20-00 1130 Utilization Mfg#: 26-25-01 Notes: [End of Month
ial Inspection (R) GE-115 GV 572 Maintenance Due List Page 1 of 58 09 Feb 2015 @ 2015 Gultstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company EFTA00604549 Code Description Required Frequency Last CM Next Due (*=Adj) Time Remains Approx Price Code Manhours Part Number Serial
Bottle Pressure Switch Operational Test GV AMM Functionat(Ops Test (O) 24 MOS 6460.9 1611 10 Nov 2013 10 Nov 2015 9Mos 1.0 262560 Airframe Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection A800100.2 NSN GV AMM Special Inspection (R) 12 MOS 7012.3 1737 05 Sep 2014 10 Sep 2015' 7Mos 1.0 2625
15 11 Days G-CGUL Maintenance Next Due Report (GN-7003) Page 1 of 45 20 Jan 2015 2015 Gulf stream Aerospace Corporation. All Rights Reserved. A General Dynamics Company EFTA00620955 ATA Description Part Number Source Document Frequency (ncinitial) Complied With HrsiCyc/Date Next Due Nadi) Remaining Hrsi
Airframe MAN 05.20.00 949 Mfg#: 2561-03 Notes: [End of Month Item) [1 MOS Window) 31 Aug 2003 12 MOS 20 Oct 2014 31 Oct 2015 9 Mos 262560 Trash Receptacle Enclosure (Aft Lavatory) G550 AMM 3444.5 * Airframe MAN Detailed Inspection 05.20.00 949 Mfga: 2625-01 Notes: [End of Month Item) (1 MOS Window) 31
007 0.00 608.175000 G-CGUL G550 5176 Current Status Page 102 of 614 20 Jan 2015 O2015 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company EFTA00620278 Code '=Custom Desc Iption TSNHR TSOHR TSRHR Required Frequency Last CM Next Due ('r.AdJ) Avg Manhours Part Warranty Par
orward Galley Annex) 0.0 474276 NSN 0 No 0 26.24.03 work pack FLO14715 2849.4 Hrs 833 CA_ 04 Apr 2013 1.00 899.966400 262560 Airframe Trash Receptacle Enclosure (Aft Lavatory) - Detailed Inspection 26.25.01 (End of Month Item) (1 MOS Window) 12 MOS 3444.5 Hrs 949 CI_ 21 Oct 2014 31 Oct 2015 1.00 262
Entities connected to both General Dynamics Company and Trash Receptacle Enclosure

Samantha Power
PERSONWing Rear Beam
ORGANIZATIONTSNMO
ORGANIZATIONMain Fuel Boost Pump
ORGANIZATIONFirst Aid Kit
ORGANIZATIONPower Transfer Unit
ORGANIZATIONTrim Cables
ORGANIZATIONRudder Control
ORGANIZATIONAileron Control
ORGANIZATIONOps Number(s
ORGANIZATIONMain Landing Gear Corrosion
ORGANIZATIONCowl Doors
ORGANIZATIONFuel Shut
PERSONEmpennage FS
ORGANIZATIONService Life
ORGANIZATIONAileron Inter-column
ORGANIZATIONElevator Control
ORGANIZATIONUpper Surface of Center Wing
ORGANIZATIONAir Turbine Starter Oil - Change
ORGANIZATIONCockpit Voice Recorder Operational Test
ORGANIZATION