3
Shared Docs
3
Same-Page
6 / 3
Mentions
located in the baggage compartment equipment cabinet and holds the configuration data for the system. One (I) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands front the MODMAN through an Ethernet Interface to configure the antenna/KRFU and
inet and holds the configuration data for the system. One (I) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands front the MODMAN through an Ethernet Interface to configure the antenna/KRFU and reports status over this Ethernet interface On
nd ground transportable terminals. The Radome will be removed and replaced by a new Ka-band capable radome. Certification: The Jet ConneX (Ka-band) High-Speed Data System along with the Satcom Direct Router will be installed via Gulfstream STC; expected, availability of STC, 4th Quarter 2017. n* SEE APPENDIX *** For
located in the baggage compartment equipment cabinet and holds the configuration data for the system. One (1) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands from the MODMAN through an Ethernet interface to configure the antenna/KRFU and r
inet and holds the configuration data for the system. One (1) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands from the MODMAN through an Ethernet interface to configure the antenna/KRFU and reports status over this Ethernet interface One
nd ground transportable terminals. The Radome will be removed and replaced by a new Ka-band capable radome. Certification: The Jet ConneX (Ka-band) High-Speed Data System along with the Satcom Direct Router will be installed via Gulfstream STC; expected, availability of STC. 4th Quarter 2017. .•• SEE APPENDIX *fl Re
a-band) High-Speed Data System Installation (continued) One (1) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands from the MODMAN through an Ethernet interface to configure the antenna/KRFU and reports status over this Ethernet interface One
ONICS 2. Avionics (continued) 2.2 Jet ConneX (Ka-band) High-Speed Data System Installation (continued) One (1) Ka-band Aircraft Network Data Unit (KANDU) will be installed in the boiler room. The KANDU receives commands from the MODMAN through an Ethernet interface to configure the antenna/KRFU and r
Ka band Installation. "(see notes) • Reference attached limitation disclaimer regarding operation and coverage limitations of Jet ConneX (Ka-band) High-Speed Data System. • Expected Scheduling of this installation will begin approximately 4th Quarter 2017. Please contact your Regional Sales Manager to coordinate th
Entities connected to both KANDU and High-Speed Data System
Natural Wood Veneer
ORGANIZATIONLarry Visoski
PERSONKRFU Convection Cooled
ORGANIZATIONDoug Band
PERSONthe Satellite Television
ORGANIZATIONModem
ORGANIZATIONCentral Maintenance Computer
ORGANIZATIONOptions Data
ORGANIZATIONThis Service Change
ORGANIZATIONASC 085A XM Weather Installation
ORGANIZATIONBroad-Band
ORGANIZATIONMODMAN
ORGANIZATIONAircraft Network Data Unit
ORGANIZATIONFrequency Unit
ORGANIZATIONCert Fox
PERSONRadome
ORGANIZATION
Samantha Power
PERSONMedia Part
ORGANIZATIONGulfstream
ORGANIZATIONCustom ECL
ORGANIZATION