any additional work being performed and it is understood Mat the Change Order may Increase material delivery WOW fintWOr acoong work erne 12. Lead.Tirnes given are based on inlemiatian received by suppliers and manufacturers and we subjecl to change at any line. therefore OW shall not be held responsib
rge. 16. Following is excluded: Final protection and cleaning. Glass or tArror breakage by others, Tesbng. Engineering. Permits. Bonds. Clernaliben. Temporary Enclosures. Repairs or Modilicztion of Existing Opening or Frames. Con Drilling tor Floor Closures. Any Electrical Work, uNOSS noted in the scope 01 work. 16.
any additional work being performed and il is understood that the Change Order may ',crease matenat delivery brnes ander prolong work OMB. 12. Leed.Tirnes given are based on intomiaten received by suppliers and manufacturers and are subject to change at any line. therefore Dulles Glass and Mirror shall
harge. 15. Fdloning is excluded: Final protection and cleaning, Glass or tArror breakage by others, Testing, Engineering. Pewits. Bonds. Demolition. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling Ice Floor Closures. Any Electrical Work. uNess noted in the scope 01 work. IS
y additional work being performed and it is understood Mat the Change Order may increase material delivery omens fintWeir poking work erne 12. Lead.Tirnes given are based on inlemiatian received by suppliers and manufacturers and we subject to change at any lime. therefore OW shall not be held responsib
rip charge. 16. Following is excluded: Final protection and cleaning. Glass or Maw breakage by others, Tesbng. Engineering. Pants. Bonds. Ouncliben. Temporary Enclosures. Repairs or Modified:on of Existing Opening or Frames. Core Drilling tor Floor Closures. Any Notice! Work, udeSS noted in the scope 01 work. 16. Or
any additional work being performed and il is understood that the Change Order may ',crease matenat delivery brnes ander prolong work OMB. 12. Leed.Tirnes given are based on intomiaten received by suppliers and manufacturers and are subject to change at any line. therefore Dulles Glass and Mirror shall
harge. 15. Fdloning is excluded: Final protection and cleaning, Glass or tArror breakage by others, Testing, Engineering. Pewits. Bonds. Demolition. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling Ice Floor Closures. Any Electrical Work. uNess noted in the scope 01 work. IS
Entities connected to both Tirnes and Temporary Enclosures

Glass
PERSONManassas
LOCATIONDulles Glass
PERSONDULLES GLASS & MIRROR
ORGANIZATION
Mirror
ORGANIZATIONBrice-Little
PERSON
Saint James
LOCATIONAcrylic Mirror
ORGANIZATIONCeders
ORGANIZATIONField Measurement
ORGANIZATIONINNO ATION
ORGANIZATIONSilver Spring
LOCATION
Condoleezza Rice
PERSONCurb Side
PERSONMirror Mastic
ORGANIZATIONCurb Side Ileircery
PERSONOaten
PERSONinStal ration
ORGANIZATIONthe Site a CenhgutatOn
ORGANIZATIONWan Owner
ORGANIZATION