4
Shared Docs
4
Same-Page
4 / 4
Mentions
JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5/24. m
LSJ Suburban Carlos & Cliffs Auto Repairs Accident Evened on June 9.2019 9.33.34 PM 80T DasaIption Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metc
erator Room Contractors Hurncane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ ifelipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 26 HM Storage & Contractors 00x00 Bld. 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cottag
C 134 LSJ Suburban Mi lz& Cliffs Auto cpa rs Accident Remove damaged sail boat Remove boat debris Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24 Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Metcalf: Blanket install on the exhaust
ator Room & Contractors Hurricane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ Helipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 28 HM Storage & Contractors 00x00 Bid. ? 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cott
162 137 JE Denali & Caribbean Auto Man A/C 138 LSJ Suburban ALto epairs Accident Description Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time s 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metca
6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5124. 26 HM
arlos & Caribbean Auto Mart aC 138 LSJ Suburban Carlos & Cliffs Auto Repairs Accident DeBenetton Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metc
Entities connected to both Wreckshop and Blue Ocean Tackle Inc.

Jeffrey Epstein
PERSON
Oliver Stone
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSON
Richard Kahn
PERSONTiki Hut
ORGANIZATIONSolar Lights
ORGANIZATIONGSJ Terrace
ORGANIZATIONMain Compound
ORGANIZATION
Cabana
LOCATIONJE Denali
ORGANIZATIONNew Planter
LOCATIONGrotto
ORGANIZATIONBarge
PERSONRIO Parts
ORGANIZATION
Marc Rich
PERSONLeon Black
PERSON
Palm Beach
LOCATION
Samantha Power
PERSONFlanders
LOCATION