JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5/24. m
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
erator Room Contractors Hurncane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ ifelipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 26 HM Storage & Contractors 00x00 Bld. 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cottag
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
ator Room & Contractors Hurricane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ Helipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 28 HM Storage & Contractors 00x00 Bid. ? 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cott
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5124. 26 HM
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Wreckshop and Tropical Shipping STT

Jeffrey Epstein
PERSON
Oliver Stone
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSON
Richard Kahn
PERSONTiki Hut
ORGANIZATIONSolar Lights
ORGANIZATIONGSJ Terrace
ORGANIZATIONMain Compound
ORGANIZATION
Cabana
LOCATIONJE Denali
ORGANIZATIONNew Planter
LOCATIONGrotto
ORGANIZATIONBarge
PERSONRIO Parts
ORGANIZATION
Marc Rich
PERSONLeon Black
PERSON
Palm Beach
LOCATION
Samantha Power
PERSONFlanders
LOCATION