JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5/24. m
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
erator Room Contractors Hurncane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ ifelipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 26 HM Storage & Contractors 00x00 Bld. 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cottag
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
ator Room & Contractors Hurricane Shutters 22 GSJ Cottage & Contractors Expert Builders 23 GSJ Helipad Helipad 24 LSJ Tunnel Skin it 25 Wreckshop 40x60 Bld. 28 HM Storage & Contractors 00x00 Bid. ? 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cott
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approval and sign off of the plans will be sent to Buck Steel 5124. 26 HM
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both Wreckshop and Christmas Cove Service Dock

Jeffrey Epstein
PERSON
Oliver Stone
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSON
Richard Kahn
PERSONTiki Hut
ORGANIZATIONSolar Lights
ORGANIZATIONGSJ Terrace
ORGANIZATIONMain Compound
ORGANIZATION
Cabana
LOCATIONJE Denali
ORGANIZATIONNew Planter
LOCATIONGrotto
ORGANIZATIONBarge
PERSONRIO Parts
ORGANIZATION
Marc Rich
PERSONLeon Black
PERSON
Palm Beach
LOCATION
Samantha Power
PERSONFlanders
LOCATION