4
Shared Docs
4
Same-Page
4 / 4
Mentions
er time 7-8 weeks plus transit time (4-5 days). Production completion date plus transit time 7/26/2019. Dave to continue checking on the progress. NC Unit Temp a/c installed. Board ordered. Waiting on schedule. NC Unit Shipping next week and hopes to have by May 31st. Goal is to install week of June
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
ist cleanJp / Floors to be redone CB-3 62 Countertops EB From FL now? 63 Move In LSJ In Progress 2/4 64 651 Chilax Room tbd , I 66. NC Unit 67 ! reefco 1, le .. In Progress . i . 68, Tild Kitchen 1 01/25/19 Demo done • tile next then cabinets installed, counter tops, finishes
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5131. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, of-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dire
eefco Reefco MEP 128 110 LSJ / GSJ Landscaping 129 111 Island Wide Landscapers 130 112 LW Main Compound 131 132 Air Handler A/C Unit NC Unit NC Unit A/C Unit Replace air handler for the Ubrary.=rdered 5/27; current lead time 7-8 weeks plus transit 114-5 days). Production completion dat
m Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. =will schedule barge to pick up direc
routine schedule for Cabana 4. 106 GSJ Reefco NC Unit PM already on routine schedule. Bedroom. Kitchen & Living Room 107 LSJ Laundry Reefer, NC Unit Housekeeping NC is not working 108 LSJ Landscaping Cnstobal & Fabian Irrigation Install irrigation for new palms 109 GSJ Stones Danny & Reno
urn Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
Entities connected to both NC Unit and John Deere

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONLeon Black
PERSON
Samantha Power
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSONDaphne Wallace
PERSON
Carlos
PERSONKaren
PERSON
Julie K. Brown
PERSONBlue Ocean Tackle Inc.
ORGANIZATIONPanels
ORGANIZATION
Palm Beach
LOCATIONInsurance Coverage & Repairs
ORGANIZATIONAllied
ORGANIZATIONTwin Bedroom
ORGANIZATIONFranks Electric
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATION