4
Shared Docs
4
Same-Page
4 / 4
Mentions
e furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
uilding replaced - work to begin 7/18 EFTA00522045 - Painting — power sanding/rust removal continues — JE would like painting completed by 7/27 - Engineering Storage & Shelving — work started 7/13 — JE would like completed by 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s
om 5 Palms once new 5 Palms furniture on site — on site 8/3 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
Power sanding/rust removal complete - painting — COMPLETE - Engineering Doors — frames in place — doors hung — painting and caulking in progress - Engineering Storage & Shelving — must be completed by 8/14 - Engineering shed outer wall — in progress - Landscaping —Sea grapes transplanted per JE direction 7/30 - COMPLETE -
ide furniture from 5 Palms now that new 5 Palms furniture on site 16. Chillax Room — requires furniture piece for electrical/media equipment a 17. Chillax Bathroom - require blue rugs for bathroom & vanity area = 18. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Il
n up — in progress - per JE direction by 8/14 - Engineering Doors — frames in place — doors hung — painted and caulked — plaster work in progress - Engineering Storage & Shelving — COMPLETE - Engineering shed outer wall — COMPLETE 9. Triangle - - Peter transplanted 3 palms from engineering per JE directive 7/26 — COMPLETE 1
e furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
l Shed concrete pad — COMPLETE - Metal Sheets - on old building replaced — COMPLETE - Power sanding/rust removal complete - painting in progress - Engineering Storage & Shelving — concrete wall repaired 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s) to travel to Josephine
Entities connected to both Chillax Bathroom and Engineering Storage & Shelving

Jeffrey Epstein
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSON
Oliver Stone
PERSONDarren & Rich
ORGANIZATION
Kawasaki
LOCATION
Carlos
PERSON
Samantha Power
PERSONJosephine
PERSONJules
PERSONMedia Room
ORGANIZATIONMacs Desktops & 1 Laptop
ORGANIZATION
Sergey Brin
PERSONElectronics Unlimited
ORGANIZATION
Coral Bay
LOCATIONNanna
PERSON
Shields
PERSONCross Brackets & Robe Hooks
ORGANIZATIONBrice 7/24 -
ORGANIZATION