on and Sitework Credit 4-inch reinforced pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 13.000 561.00 S.Y. $793,000.00 13.0(X) 515AX) S.Y. $37,500.00 1 -S114.000.00 L.S. 4114,000.00 Tot
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and da
and Sitework Credit Description 2-inch pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 1.500 S350.00 Ton 5525.000.00 11080 515.00 S.Y. $37.500.00 1 -$114.000.00 -5114.000.00 Total Base
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and d
ork Credit Description 4-inch reinforced pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 13.0(X) 561.00 S.Y. 5793.000.00 13.0(X) 515.00 S.Y. $37.500.00 -$114.000.00 -5114.000.00 Total Base
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and da
and Sitework Credit Description 2-inch pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 1.500 $285.00 S-327.5oo.(x) 13000 515.(10 S37.500.00 -SI14.000.00 L.S. -S114.(1410.00 Total Base Pri
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and d
eview =he base and give you some numbers for the scope? 2 EFTA_R1_01585712 EFTA02473357 <= class="MsoNormal"> Kindest Regards, Eason Jef=ers Betteroads Asphalt LLC <=span> </=iv> Richar= Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New Yor=, NY 10022 fax <a cell <tel please note The=infor
ay. Kindest Regards, > wrote: <=iv style="margin:0in Din 0.0001ptfont-size:11ptfont-family:Calibri,sarp-seriflEason Jeffers USVI Gen=ral Manager Betteroads Asphalt LLC<=span> > <=> <Bettero=ds Proposal_ Added Aggregate Base.pdf> =/blockquote> Forwarded message ------_--- From: "Eason Jeffers" < Date: Aug
Entities connected to both Betteroads Asphalt LLC and Betteroads Asphalt
Asphalt Pathways Paving Works
ORGANIZATIONConcrete Swales
LOCATIONCrown Bay Marina
LOCATIONTack Coat
PERSON
Poland
LOCATIONQuantum Vision Construction LLC
ORGANIZATIONEason Jeffers
PERSON
Marc Rich
PERSON
Richard Kahn
PERSONQuantum Vision Construction LLC's
ORGANIZATION
Jeffrey Epstein
PERSON