4
Shared Docs
4
Same-Page
4 / 4
Mentions
on Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 Construction Proposal January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and da
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and d
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and da
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
r replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and d
Entities connected to both Asphalt Pathways Paving Works and Betteroads Asphalt
Concrete Swales
LOCATIONCrown Bay Marina
LOCATIONBetteroads Asphalt LLC
ORGANIZATIONTack Coat
PERSON
Poland
LOCATIONQuantum Vision Construction LLC
ORGANIZATIONQuantum Vision Construction LLC's
ORGANIZATION