4
Shared Docs
4
Same-Page
4 / 4
Mentions
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. 4 NC 42. Permits lii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
These have been replaced and an extra set has been purchased for the bike at Zorro — Richard will take with him to Zorro and install. + Update 8. Control Boards for Exhaust System vi) Purchased - will be installed by 16th October. + NC + This should be under a sub heading of 9. Coloured Boards for entr
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 42. Permits Iii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
These have been replaced and an extra set has been purchased for the bike at Zorro — Richard will take with him to Zorro and install. + Update 7. Control Boards for Exhaust System vi) Purchased - will be installed by 16th October. + NC + This should be under a sub heading of decoration on same page 8. C
o contacted Alan Stopec for his advice. + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits lviii) No progress to report — ongoing. ******************** EFTA00577820
hard to be able to access survey cameras from his home computer. + Update 4. True Bike Shock Absorbers v) These have been replaced + Update 5. Control Boards for Exhaust System vi) Purchased - will be installed by 16th October. Update 6. Lighting viii) NS is meeting with Charles, Bill Bigelow and Davi
FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits (viii) No progress to report — ongoing. + NC 41.Madison Cox to show pictures lix) No progres
hard to be able to access survey cameras from his home computer. + Update 4. True Bike Shock Absorbers v) These have been replaced + Update 5. Control Boards for Exhaust System vi) Purchased - will be installed by 16th October. Update 6. Lighting viii) NS is meeting with Charles, Bill Bigelow and Davi
Entities connected to both Tuttle and Control Boards

Jeffrey Epstein
PERSON
Prince Charles
PERSONDarren Indyke
PERSON
Marc Rich
PERSON
Ghislaine Maxwell
PERSONEd Tuttle
PERSONPinto
PERSON
Zorro
LOCATIONPascal
PERSONMiles
PERSON
Puerto Rico
LOCATIONCurtain Rod
PERSONColoured Boards
ORGANIZATIONDan Ariaz
PERSONJE sd
ORGANIZATION
Oliver Stone
PERSONBoudoir
LOCATIONLookout House
ORGANIZATIONRockwell Group
ORGANIZATION
Robert Gates
PERSON