but first I would like to comment on the condition of the LSJ Barge. This vessel was hauled out at our yard three years ago . During that haul out Subbase quoted on most of the items you have in this current list. It was surprising to see that our recommendations were not completed and as a result the
to budget for this I would reserve 5k to 7k for this project. (before exhaust system is finalized this alignment must be done). 6) Stuffing boxes: Subbase was informed that new stuffing boxes arc on hand and will be owner supplied, after haulout removal of hose joining stuffing box to shaft log will re
see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. The steel boxes that secure the cylinders to the hull are deteriorated and will need replacement. Subbase recommends using stai
Subbase D dock Inc. T: PO Box 4429/ Parcel 162 Subbase Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms We accept cas
r recommendations made at that time. (before exhaust system is finalized this alignment must be done). 7000 Labor and Material 6.) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be owner supplied, after haulout removal of hose joining stuffing box to shaft log will re
c tank, Subbase reccomends replacing tank with new marine grade aluminum tank complete with all necessary fittings and sight glass to view levels. Labor and Materials. 21.) Engine Room Wiring: Upon an inspection of the engine room. Subbase Drydock has determined that all of the engine room wiring is compromised.
but first I would like to comment on the condition of the LSJ Barge. This vessel was hauled out at our yard three years ago . During that haul out Subbase quoted on most of the items you have in this current list. It was surprising to see that our recommendations were not completed and as a result the
to budget for this I would reserve 5k to 7k for this project. (before exhaust system is finalized this alignment must be done). 6) Stuffing boxes: Subbase was informed that new stuffing boxes arc on hand and will be owner supplied, after haulout removal of hose joining stuffing box to shaft log will re
see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. The steel boxes that secure the cylinders to the hull are deteriorated and will need replacement. Subbase recommends using stai
Entities connected to both Subbase and Labor and Materials