the General Conditions of the Contract for Construction
ORGANIZATIONGeotechnical Engineers
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
Entities connected to both the General Conditions of the Contract for Construction and Geotechnical Engineers
Environmental Consultants
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATION
Jeffrey Epstein
PERSON
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONthe Construction Cost
ORGANIZATION