Drawings and Specifications
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
Entities connected to both Drawings and Specifications and the General Conditions of the Contract for Construction

Jeffrey Epstein
PERSON
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONEnvironmental Consultants
ORGANIZATIONLand Surveyor
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONGeotechnical Engineers
ORGANIZATION