CUNNINGHAM, INC. AGREEMENT made as of the 25th day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Provide full architectural services for a new single-family residence
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set fo
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set fo
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
Entities connected to both Wallace E. Cunningham Inc. and Geotechnical Engineers

Jeffrey Epstein
PERSONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONEnvironmental Consultants
ORGANIZATION
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATIONthe Construction Cost