Wallace E. Cunningham Inc.
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
CUNNINGHAM, INC. AGREEMENT made as of the 25th day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Provide full architectural services for a new single-family residence
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set fo
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set fo
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
Entities connected to both Wallace E. Cunningham Inc. and the General Conditions of the Contract for Construction

Jeffrey Epstein
PERSONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONEnvironmental Consultants
ORGANIZATION
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONGeotechnical Engineers
ORGANIZATIONthe Construction Cost
ORGANIZATION