AGREEMENT BETWEEN OWNER AND WALLACE E. CUNNINGHAM, INC. AGREEMENT made as of the 25th day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E.
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
AGREEMENT BETWEEN OWNER AND WALLACE E. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. C
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
AGREEMENT BETWEEN OWNER AND WALLACE E. CUNNINGHAM, INC. AGREEMENT made as of the 2nd day of February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. C
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
Entities connected to both WALLACE E. CUNNINGHAM and Drawings and Specifications

Jeffrey Epstein
PERSON
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONEnvironmental Consultants
ORGANIZATIONLand Surveyor
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATIONGeotechnical Engineers
ORGANIZATION