t. They will need 5-7 truckloads per day. Better Roads has planned a 5 day per week schedule, and will leave Saturdays and Sundays for "rain days". Boyson can move 2-3 trucks per trip. To catch the high tide, Better Roads will be at Red Hook at 6:00 am with all 6 loads. Boyson will take the first group
ttniont. Better Roads will coordinate with LSJ on transportation needs. In the event that Big N is not available, we will work the extra trips into Boyson's schedule. Presuming that the scope of the project is still the same, Better Roads estimates transporting 75-80 truckloads of asphalt in total for
t. We are respectfully proposing to use the Week of Monday, July 27, 2015 for Better Roads to mobilize their equipment and lighter materials, using Big N, for the road prepping, and to begin the actual laying of the asphalt the Week of Monday, August 3, 2015. Big N will be the auxiliary vessel for tr
ds can begin the Road Paving project the week of Monday, January 26, 2015. They would mobilize their equipment and lighter materials, using Big N or Boyson, spend this first week prepping, and begin laying the asphalt the week of February 3rd. Big N will be the auxiliary vessel for transportation throu
etter Roads can begin the Road Paving project the week of Monday, January 26, 2015. They would mobilize their equipment and lighter materials, using Big N or Boyson, spend this first week prepping, and begin laying the asphalt the week of February 3rd. Big N will be the auxiliary vessel for transporta
s Gene does not foresee any catastrophic setbacks, but at this time he also does not see the completion before the end of July. When we speak with Boyson on Monday, I will request their barge for the mobilization of Better Roads equipment, and that they work with us as auxiliary until Big N's return,
rote: yesterdady you said the 10t? On Fri, Jun 19, 2015 at 9:43 AM, Daphne Wallace < > wrote: Greetings Sic The realistic date for the return of Big N is Friday, July 31. We spoke with Gene this morning (Gene spoke with Boscoe last night) who summarized for us the parts to be completed before the
s Ge=e does not foresee any catastrophic setbacks, but at this time he also doe= not see the completion before the end of July. W=en we speak with Boyson on Monday, I will request their barge for the mobi=ization of Better Roads equipment, and that they work with us as auxiliary=until Big N's return,
terdady you said the 10t? On Fri, Jun 19, 2015 at 9:43 AM, Daph=e Wallace < <mailto > wrote: Greetings Sir, The re=listic date for the return of Big N is Friday, July 31. We spoke with Gene this morning (Gene spoke with Boscoe last night) =ho summarized for us the parts to be completed before the
Entities connected to both Boyson and Big N

Jeffrey Epstein
PERSONDaphne Wallace
PERSON
Richard Kahn
PERSONBarge
PERSON
Marc Rich
PERSONAnn Rodriquez
PERSONBoscoe
ORGANIZATIONDarren Indyke
PERSONBrice Gordon
PERSON
Thomas Jefferson
PERSONBig N's
ORGANIZATION