From: Leighton Allenby To: Jeffrey Epstein <[email protected]> Cc: NYC - Richard Kahn , Leighton Allenby Subject: Neptune LLC Construction Costs Date: Mon, 24 Aug 2
rvices, lead time to start, days to complete, etc). If needed I can send you the backup documentation from Dan as a pdf. I. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: N
From: "Jeffrey E." <[email protected]> To: Leighton Allenby < >, Richard Kahn Subject: Re: Neptune LLC Construction Costs Date: Mon, 24 Aug 2015 12:28:27 +0000 where is structural repair to roomms ?? On Mo
rvices, lead time to start, days to complete, etc). If needed I can send you the backup documentation from Dan as a pdf. I. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: N
From: Leighton Allenby To: "jeffrey E." <[email protected]> Cc: Richard Kahn Subject: Re: Neptune LLC Construction Costs Date: Mon, 24 Aug 2015 12:33:27 +0000 the en
rvices, lead time to start, days to complete, etc). If needed I can send you the backup documentation from Dan as a pdf. 1. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: N
Entities connected to both Leighton Allenby and AIG Wind Mitigation - two