4
Shared Docs
4
Same-Page
4 / 4
Mentions
5.20.00 0 Inspection Mfg#: 53.30-00 Notes: [End of Month Item) (1 MOS Window) 10 15 Oct 2007 96 MOS 26 Nov 2007 30 Nov 2015 10 Mos 570017 Wing Rear Beam at Aileron (Left) - Zonal G550 AMM 0.0 * Airframe MAN Inspection 05.20.00 0 Mfga: 57-50-00 Notes: (End of Month Item) (1 MOS Window) 10 15
833 Mfga: 27.11-01 Notes: [End of Month Item] [50 Hour Window] [I MOS Window] 23 20 Jun 2013 48 MOS 10 Apr 2013 30 Apr 2017 27 Mos 271303 Aileron Hardover Prevention System (Left) G550 AMM 1000 Hrs 2849.4 3849.4Hrs 382.9 Hrs Airframe MAN Operational Check 05.2000 833 M10:27-11-17 Notes: [50 Hour Window] 31 A
m] (1 MOS Window] 6550 AMM 1605.6 05-20-00 621 31 Aug 2003 24 MOS 24 Feb 2014 29 Feb 2016 18 Days 575004 * Airframe MAN Mfg#: 57-50-00 Wing Rear Beam (Right) - Zonal Inspection Notes: (End of Month Item] (1 MOS Window] 6550 AMM 1605.6 05-20-00 621 31 Aug 2003 24 MOS 24 Feb 2014 29 Feb 201
741 Mfg#: 27.11.01 Notes: (End of Month Item] (50 Hour Window] [1 MOS Window] 23 20 Jun 2013 48 MOS 26 Aug 2014 30 Sep 2018' 31 Mos 271303 Aileron Hardover Prevention System (Left) 6550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs Airframe MAN • Operational Check 05-10-10 741 Mfg#: 27-11-17 Notes: [50 Hour Window]
m] (1 MOS Window] 6550 AMM 1605.6 05-20-00 621 31 Aug 2003 24 MOS 24 Feb 2014 29 Feb 2016 18 Days 575004 * Airframe MAN Mfg#: 57-50-00 Wing Rear Beam (Right) - Zonal Inspection Notes: (End of Month Item] (1 MOS Window] 6550 AMM 1605.6 05-20-00 621 31 Aug 2003 24 MOS 24 Feb 2014 29 Feb 201
741 Mfg#: 27.11.01 Notes: (End of Month Item] (50 Hour Window] [1 MOS Window] 23 20 Jun 2013 48 MOS 26 Aug 2014 30 Sep 2018' 31 Mos 271303 Aileron Hardover Prevention System (Left) 6550 AMM 1000 Hrs 1903.5 2910.0 Hrs* 320.0 Hrs Airframe MAN • Operational Check 05-10-10 741 Mfg#: 27-11-17 Notes: [50 Hour Window]
277012 Gust Lock Cable Pulleys - Removal/Installation No Airframe 27.71.05 0.0 Hrs 0 et 26 Nov 2007 277015 UR Laterial Control Sys Rigging, Wing Rear Beam 125 Airframe 0.0 Hrs 0 Ca_ 26 Nov 2007 277016 Rill Laterial Control Sys Rigging. Wing Rear Beam 125 Airframe 0.0 Hrs 0 CI_ 26 Nov 2007 277
302 Force Link Assembly (Right) - Removal / Installation 0.0 0.0 Hrs 2.00 1159C50258-2 0 0 OL No 0 26 Nov 2007 Airframe 27.11.17 271303 Aileron Hardover Prevention System (Left) - Operational Check 1000 Hrs 2849.4 Hrs 3849.4Hrs 1.50 833 OL 10 Apr 2013 Airframe 27.11.17 [50 Hour Window] 271304 Aileron Hardov
Entities connected to both Wing Rear Beam and Aileron Hardover Prevention System

Samantha Power
PERSONRudder Control
ORGANIZATIONAileron Control
ORGANIZATIONTrim Cables
ORGANIZATIONMain Fuel Boost Pump
ORGANIZATIONGeneral Dynamics Company
ORGANIZATIONCowl Doors
ORGANIZATIONTrash Receptacle Enclosure
ORGANIZATIONFirst Aid Kit
ORGANIZATIONFuel Shut
PERSONAileron Inter-column
ORGANIZATIONService Life
ORGANIZATIONRudder Skins
ORGANIZATIONElevator Skins
ORGANIZATIONWing Rear Beam (Left
ORGANIZATIONLongitudinal Control System Friction
ORGANIZATIONEmpennage FS
ORGANIZATIONPylons External
ORGANIZATIONPylons Internal (Left
ORGANIZATIONMain Landing Gear Corrosion
ORGANIZATION