ry, I don't have an answer as yet" He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
eted application on behalf of the owner. 30 GSJ Barn Jeffrey Boschulte Permits Permits: Barn - JB awaiting selection of supplier and specs. 31 GSJ Terrace Jeffrey Boschulte Permit Build 75 foot round terrace. 32 GSJ Pool Extension Jeffrey Boschulte Permit Extend current pool to 80 feet from 15 f
weather. Per 5 " I'm sorry, I don't have an answer as yet" He waiting on ..ontractor to give him answers on the hydraulic. e wi i con inue o call Barge arrival home could be between June 10th-15th Take Nana to Offshore to get tie Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
tors 00x00 Bld. 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cottage Permits 30 GSJ Barn Permits 31 GSJ Terrace Permit 32 GSJ Pool Extension Permit 33 Waterfall (Tiki or Juggly Park) Slab 34 Gym Contractors Doors 35 Flagpole Pool Contractors Sha
r. Per 6/5 " sorry, I don't have an answer as yet" He's waiting on Contractor to give him answers on the hydraulic. e wr will con inue to call Barge anival home could be between June 10th-15th Take. to Offshore to get the Engines Checked Nautica delivered 918/19. Fiberglass modifications in pr
rs 00x00 Bid. ? 27 LSJ Fuel Room Reefco Vents 28 Engineering & Contractors Doors 29 GSJ Staff Cottage Permits 30 GSJ Barn Permits 31 GSJ Terrace Permit 32 GSJ Pool Extension Permit 33 Waterfall (Tiki or Juggly Park) Slab 34 Gym & Contractors Doors 35 Flagpole Pool Contractors S
ry, I don't have an answer as yet* He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications i
ed application on behalf of the owner. 0 30 GSJ Barn Jeffrey Boschulte Permits Permits: Bam - JB awaiting selection of supplier and specs. 31 GSJ Terrace Jeffrey Boschulte Permit Build 75 foot round terrace. 32 GSJ Pool Extension Jeffrey Boschulte Permit Extend current pool to 80 feet from 15 f
llowing up) 33 Gym Doors -Gym Doors, window, 12 cement bags at Port! Need PU asap! (Mike will try to get them on LSJ early next week)-Waiting for Barge! 35 LSJ Tiki Hut Freezer 36 Flagpole Pool Freezer 37 Dock (LS1 or GSJ) ? Permits 38 Christmas Cove Moorings Moorings 39 Old Generators
ry Johnson Wax-DONE 68 LS1 MC Kitchen Doors-DONE 70 Cabana 3 Shower Tile-DONE 9 Theater Room Carpet DONE 51 LS1 MC Kitchen Kick Plate - 72 GSJ Terrace Chandelier-DONE (Bulbs just need to be installed) 84 LS1 Dock-Nest Cam-DONE EFTA00286248 More NOTES from Conference Call May 24. 2019 -When wi
Entities connected to both Barge and GSJ Terrace

Jeffrey Epstein
PERSON
Richard Kahn
PERSONAnn Rodriquez
PERSON
Marc Rich
PERSONDaphne Wallace
PERSON
Carlos
PERSON
Oliver Stone
PERSON
Condoleezza Rice
PERSON
Cabana
LOCATION
Robert Gates
PERSONTiki Hut
ORGANIZATION
Julie K. Brown
PERSON
Samantha Power
PERSONSolar Lights
ORGANIZATIONJE Denali
ORGANIZATIONNew Planter
LOCATIONMain Compound
ORGANIZATIONLeon Black
PERSONDarren Indyke
PERSONKaren
PERSON