on basis. 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: twenty percent (20%) Design Development Phase: thirty percent (20%) Construction Documents Phase: thirty percent (40%) Bidding/Negotiation
pproval of authorities having jurisdiction over the Project; 5. Reproductions, including electronic plotting services; 6. Postage and handling of Design Drawings and Outline Specifications; 9 WALLACE E . CUNNINGHAM, INC. 1111 Woni Acho• Drive, Son Di.uo, Coliforniu USA 92103 Phon•. Fox: Emo' l
00613681 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
pproval of authorities having jurisdiction over the Project; 5. Reproductions, including electronic plotting services; 6. Postage and handling of Design Drawings and Outline Specifications; 7. Expense of overtime work requiring higher than regular rates, if authorized by the Owner; 8. Professional quality
02672718 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
pproval of authorities having jurisdiction over the Project; 5. Reproductions, including electronic plotting services; 6. Postage and handling of Design Drawings and Outline Specifications; 7. Expense of overtime work requiring higher than regular rates, if authorized by the Owner; 8. Professional quality
Entities connected to both Schematic Design Phase and Design Drawings

Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONReimbursable
PERSONProject Architect
ORGANIZATIONthe Contract Sum
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONEnvironmental Consultants
ORGANIZATION
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATION