on basis. 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: twenty percent (20%) Design Development Phase: thirty percent (20%) Construction Documents Phase: thirty percent (40%) Bidding/Negotiation
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
00613681 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
02672718 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
characteristics, legal limitations, and utility locations for the site of the Project, a written legal description of the site and the services of Geotechnical Engineers or other consultants when such services are requested by WCI and agreed to by the Owner. 4.3 The Owner shall furnish structural, mechanical, chemi
Entities connected to both Schematic Design Phase and Geotechnical Engineers

Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONReimbursable
PERSONProject Architect
ORGANIZATIONthe Contract Sum
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONEnvironmental Consultants
ORGANIZATION
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONthe General Conditions of the Contract for Construction