3
Shared Docs
3
Same-Page
3 / 3
Mentions
on basis. 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: twenty percent (20%) Design Development Phase: thirty percent (20%) Construction Documents Phase: thirty percent (40%) Bidding/Negotiation
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
00613681 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
02672718 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: Design Development Phase: Construction Documents Phase: Bidding/Negotiation Phase: Site Observation Phase: Total Basic Compensation twenty per
ON DOCUMENTS PHASE 2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2.3.2 WCI shall assist the Owner in connection with the Owner's respo
Entities connected to both Schematic Design Phase and Drawings and Specifications

Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONReimbursable
PERSONProject Architect
ORGANIZATIONthe Contract Sum
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONEnvironmental Consultants
ORGANIZATION
San Diego
LOCATIONWALLACE
PERSONthe Contract for Construction
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONthe General Conditions of the Contract for Construction
ORGANIZATIONGeotechnical Engineers
ORGANIZATION