3
Shared Docs
3
Same-Page
3 / 3
Mentions
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both Geotechnical Engineering and D.1.1 Initial Payment
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION