3
Shared Docs
3
Same-Page
3 / 3
Mentions
ion. B.2 CAD FORMAT AND STANDARDS. Gensler and its consultants will use AutoCAD 2004 or 2006 and Gensler's CAD Standards. At the completion of the Project, Gensler will deliver electronic files of Gensler's Construction Documents and Bulletins. Gensler will translate CAD files provided by Client and/or Client's
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
ion. B.2 CAD FORMAT AND STANDARDS. Gensler and its consultants will use AutoCAD 2004 or 2006 and Gensler's CAD Standards. At the completion of the Project, Gensler will deliver electronic files of Gensler's Construction Documents and Bulletins. Gensler will translate CAD files provided by Client and/or Client's
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions pre
ion. B.2 CAD FORMAT AND STANDARDS. Gensler and its consultants will use AutoCAD 2004 or 2006 and Gensler's CAD Standards. At the completion of the Project, Gensler will deliver electronic files of Gensler's Construction Documents and Bulletins. Gensler will translate CAD files provided by Client and/or Client's
l be based on Gensler's Standard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including r
Entities connected to both Project, Gensler and Drawings, Specifications
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION