3
Shared Docs
3
Same-Page
3 / 3
Mentions
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both Gensler Consultants and D.1.1 Initial Payment
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION