nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design Issues) to present and review the material. 3
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design Issues) to present and review the material. 3
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design issues) to present and review the material. 3
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Entities connected to both the Design Development Documents and Geotechnical Engineering
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION