3
Shared Docs
3
Same-Page
3 / 3
Mentions
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00605621 Gensler Little St. James Pool Area and Screen
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00724807 Gensler Little St. James Pool Area and Screen
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
red by Gensler's consultants; f) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00727146 Gensler Little St. James Pool Area and Screen
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both the Schematic Design Documents and D.1.1 Initial Payment
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION