3
Shared Docs
3
Same-Page
3 / 3
Mentions
neering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscape design (pool deck and service road areas). i)
ool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Interme
neering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscape design (pool deck and service road areas). i)
ool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Interme
neering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscape design (pool deck and service road areas). i)
ool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Interme
Entities connected to both Audio/Visual System Design and Warwick Wicksman Project Principal/Project
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION