3
Shared Docs
3
Same-Page
3 / 3
Mentions
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
(a) inconsistent with approvals or instructions previously given by Client, including revisions made necessary by adjustments in Client's program, Project Budget or Project location; (b) required by the enactment, revised interpretation, jurisdictional differences in interpretation, or revision of codes, laws or regula
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
(a) inconsistent with approvals or instructions previously given by Client, including revisions made necessary by adjustments in Client's program, Project Budget or Project location; (b) required by the enactment, revised interpretation, jurisdictional differences in interpretation, or revision of codes, laws or regula
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
(a) inconsistent with approvals or instructions previously given by Client, including revisions made necessary by adjustments in Client's program, Project Budget or Project location; (b) required by the enactment, revised interpretation, jurisdictional differences in interpretation, or revision of codes, laws or regula
Entities connected to both Acoustical Engineering and Project Budget or Project
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION