3
Shared Docs
3
Same-Page
3 / 3
Mentions
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including revisions made ne
Entities connected to both Acoustical Engineering and Project Manual
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION