or the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipmen
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
or the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipmen
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
or the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipmen
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both Mechanical, Electrical and Plumbing Engineering and D.1.1 Initial Payment
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor