3
Shared Docs
3
Same-Page
3 / 3
Mentions
uilding. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock House building on an existing dock. 5. Landscaping for the Service Road and Office Path. A.2 Project Budget. Client and Gensler will review Client's budget goals for the Project at the commencement of design. During design, Client and
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
uilding. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock House building on an existing dock. 5. Landscaping for the Service Road and Office Path. A.2 Project Budget. Client and Gensler will review Client's budget goals for the Project at the commencement of design. During design, Client and
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
uilding. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock House building on an existing dock. 5. Landscaping for the Service Road and Office Path. A.2 Project Budget. Client and Gensler will review Client's budget goals for the Project at the commencement of design. During design, Client and
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including revisions made ne
Entities connected to both the Service Road and Office Path and Project Manual
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION